Phase 2 - Dry stone dike

 

Pat Gillespie, an itinerant diker, built a wall to enclose the landscaped area at the top of the site and repaired sections either side of the plinth and on the sweep to the sea.  This wall also masked the metal work of the pens adjacent to the site.